(Source: Fresno Bee, April 14, 2015)
FRESNO, Calif. — More than $260 million has been set aside for possible cost overruns for high-speed rail construction between Fresno and the Tulare-Kern county line. California High-Speed Rail Authority directors established the contingency for the 65-mile Construction Package 2-3 at their meeting Tuesday in San Francisco.
Full story: Fresno Bee