FRA Certification Helpline: (216) 694-0240

(Source: North American Wind Power, January 15, 2015)

OXFORD, Conn. — Logistics provider BNSF and engineering/design firm Energo have developed fixtures that will help facilitate the transport of wind turbine components by rail and by ship. According to BNSF, the Blade Runner transport fixtures greatly increase efficiency and drive down logistics costs when moving wind turbines. The fixtures are universal and can be used in rail or ocean transport, the company says.

Full story: North American Wind Power