(Source: Connecticut Post, March 31, 2018)
BRIDGEPORT, Conn. — Metro-North is scrambling to meet a year-end deadline to install life-saving safety equipment that can halt speeding trains and prevent crashes — but there are concerns about whether the railroad is on schedule.
Full story: Connecticut Post