FRA Certification Helpline: (216) 694-0240

(Source: Long Island News 12, April 15, 2019)

MINEOLA — Problems are still plaguing the Long Island Rail Road’s effort to install a system that can slow or stop a train in an emergency. During a committee meeting Monday, a Metropolitan Transportation Authority contractor said a mistake was discovered in how PTC was being installed on train cars, which is now delaying the project even more.

Full story: Long Island News 12