(Source: Grand Forks Herald, June 20, 2012)
GRAND FORKS, N.D. — BNSF construction crews are installing new ties and laying new rails along a 15-mile stretch of flood-threatened railroad tracks in the Devils Lake Basin. The project calls for raising the tracks an average of 5 feet this year, to an elevation of 1,461 feet above sea level.
Full story: Grand Forks Herald